Information for 2019–2024 is available at this link   arxiv.uzbekistonmet.uz
News
Revision commission

  • 16.10.2020
  • 1478
Results for Contracts Awarded on Procurement of Relay protection and communication equipment on Package No. 4 (Lot No.2)

Project Name: Modernization and upgrade of transmission substations; Project Number: MUTS/ICB/2016; Funding source: World Bank;

  • 25.09.2020
  • 1322
Results for Contracts Awarded on Procurement of Autotransformers 500kV for substation “Lochin” on Lot No.14 Project Name: Modernization and upgrade of transmission substations

Funding source: World Bank Project Name: Modernization and upgrade of transmission substations Bid/Contract Reference No: MUTS/ICB/2016-14 Evaluation Currency: USD Procurement Method: International Competitive Bidding (ICB) Procurement Type: Goods

  • 28.07.2020
  • 1112
Cutting the shadow economy and corruption discussed at video session

On July 27, President of the Republic of Uzbekistan Shavkat Mirziyoyev held a videoconference meeting to address the works to reduce the shadow economy.

  • 27.07.2020
  • 670
PROJECT " CONSTRUCTION OF 500/220 KV OLTINSOY SUBSTATION WITH 3/167 MVA TRANSFORMERS»

The project "Construction of the 500/220 kV Oltinsoy substation with 3/167 MVA transformers" is implemented in accordance with the Decree of the President of the Republic of Uzbekistan dated January 9, 2020 no.PP-4563 "on measures to implement the Investment program of the Republic of Uzbekistan for 2020-2022" and "the Program for implementing major investment projects in the electric power industry for 2019 – 2030 through attracting foreign direct investment", approved by the Prime Minister of the Republic of Uzbekistan.

  • 02.07.2020
  • 1977
RESULTS FOR CONTRACTS AWARDED ON PROCUREMENT OF SPECIALIZED MACHINERY-2 LOT NO.11

Project Name: Modernization and upgrade of transmission substations. Project Number: MUTS/ICB/2016

  • 25.06.2020
  • 900
THE TENDER PERIOD WAS EXTENDED UNTIL JULY 1 THIS YEAR

It is known that “National Electric Networks of Uzbekistan” JSC in accordance with the Order of the President of the Republic of Uzbekistan dated January 9, 2020 No. PD-4563 “REHABILITATION 500 KV GUZAR-REGAR LINE (L-507) IN THE REPUBLIC OF UZBEKISTAN” project is being implemented.

  • 17.06.2020
  • 1110
ATTENTION, ANNOUNCEMENT! ATTENTION TO ACCREDITED EDUCATIONAL CENTERS!

JSC «NEG of Uzbekistan» announces a competition among training centers accredited in accordance with the requirements of «International Financial Reporting Standards».

  • 03.06.2020
  • 1534
RESULTS FOR CONTRACTS AWARDED ON PROCUREMENT OF HIGH-VOLTAGE AND MEDIUM-VOLTAGE EQUIPMENT ON PACKAGE NO. 4 (LOT NO.1)

Project Name: Modernization and upgrade of transmission substations. Project Number: MUTS/ICB/2016 Funding source: World Bank; Project Name: Modernization and upgrade of transmission substations; Package Reference No: MUTS/ICB/2016-4; Lot Reference No: 1; Evaluation Currency: USD; Procurement Method: International Competitive Bidding (ICB); Procurement Type: Goods;

  • 01.06.2020
  • 3189
Report for 2019

  • 28.05.2020
  • 1251
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION)

Implementation of the management information system (Enterprise Resource Planning System) Assignment Title: CONSULTING SERVICES FOR THE DEVELOPMENT OF TECHNICAL SPECIFICATIONS, FEASIBILITY STUDY AND BIDDING DOCUMENTS FOR THE IMPLEMENTATION OF THE MANAGEMENT INFORMATION SYSTEM (ENTERPRISE RESOURCE PLANNING SYSTEM) IN «NATIONAL ELECTRIC NETWORKS OF UZBEKISTAN» JSC

  • 15.05.2020
  • 1569
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION)

Uzbekistan Modernization and Upgrade of Transmission Substation Assignment Title: CONSULTING SERVICES FOR PREPARATION OF TRANSMISSION NETWORK DEVELOPMENT AND RENEWABLE ENERGY INTEGRATION PLAN FOR JSC “UZBEKISTAN NATIONAL POWER NETWORKS”.

  • 15.05.2020
  • 2513
Corporate Code

  • 14.05.2020
  • 2017
“NATIONAL ELECTRIC NETWORKS OF UZBEKISTAN”JSC ANNOUNCES INTERNATIONAL TENDER ON ENGINEERING, PROCUREMENT AND CONSTRUCTION OF TRANSMISSION LINE FROM 500kV “GUZAR” SS TO 500kV TO “REGAR” SS, UNDER FINANCING OF ASIAN DEVELOPMENT BANK (ADB)

Republic of Uzbekistan has received financing from the Asian Development Bank (ADB) towards the cost of the “Construction, 500kV Single Circuit Transmissionу Line from 500 kV “Guzar” substation (Uzbekistan) to existing 500kV “Regar” substation” Project.

  • 05.05.2020
  • 6227
ATTENTION, ANNOUNCEMENT! AN INTERNATIONAL TENDER IS BEING HELD!

JSC «National Electric Networks of Uzbekistan» announces an international competitive bid for the procurement specialized vehicles and machinery (Package No. 3) in the framework of the project «Construction of 220 kV transmission lines Takhiatash TPP - Khorezm substation - Sarymay (Khorezm region)» in «shopping» procurement procedure of the Asian Development Bank. Date of publication: 04/26/2020 Expiration Date: May 7, 2020 10:00 Tashkent time

  • 26.04.2020
  • 1507
9 months report 2019

  • 24.04.2020
  • 1215
ATTENTION, ANNOUNCEMENT! JSC «NEN OF UZBEKISTAN» ANNOUNCES A COMPETITION WITH PARTICIPATION OF THE ASIAN DEVELOPMENT BANK

JSC «National Electric Networks of Uzbekistan» announces bid for the selection of project supervision and management consultants for the projects of «Construction of 220 kV double-circuit power transmission line between Syrdarya TPP and Zafarabad Substation» and the project «Restoration of 500 kV power transmission line Guzar-Regar in the territory of Uzbekistan». Date of publication: 04.07.2020 Expiration date: May 2, 2020. 11:59 p.m (Manila local time).

  • 07.04.2020
  • 1978
Development strategy

  • 07.04.2020
  • 2209